Posting Preferences - Job To Date tab

Batch date preference

Each Sage 100 Contractor job to date (JTD) query will be associated with a particular date. This will also be used as the end date when querying records from Sage 100 Contractor.

Available options:

  • Use today's date
  • Use previous month's end date

Map Sage 100 Contractor cost types to Sage CM cost resources

You can use the Link Sage 100 Contractor Cost Types to Sage CM Cost Resources section to specify how Sage 100 Contractor cost types must be mapped to the available cost resources in Sage Construction Management. The mapping is used when querying job to date cost details.

The Save option is grayed out if any required fields are not filled out. Select the Missing Required Fields link to view the fields that must be filled out in each tab before saving.