Edit an invoice for a fixed-lump-sum prime contract
Edit the header information
- At the Prime Contract Invoice listing, click on the Prime Invoice # to view the details.
- Review the Lock status to make sure it is unchecked. Admins can temporarily unlock it even if it has been exported.
- Click the Edit button to the right of the Prime Contract Invoice Information heading.
- Edit the Prime Contract Invoice header information as needed.
- Click Save and Close.
Edit invoice details for original contract items or change orders
- With the Prime Contract Invoice form open, review the Lock status to make sure it is unchecked. Admins can temporarily unlock it even if it has been exported.
- Scroll down to the Invoice Details section.
- Click on View Invoice Details - Original Prime Contract Items or View Invoice Details - CO Items link.
To edit an existing item in the list:
- Navigate to an item and enter a value in either the Current Work, Current Stored, or % Complete cell. (See Invoice Amount Notes below.)
- Repeat step above for other items that are being billed this period.
- Click the Save or Save and Close button shown below the grid.
To import items not in the list:
- Click the Import Items drop-down shown above the grid and to the right.
- Select either Import Original Contract Items or Import Original Contract Items and COs by Job Cost Code.
- This will list items that are not 100% percent billed.
- Navigate to an item and enter a value in either the Current Work, Current Stored, or % Complete cell. (See Invoice Amount Notes below.)
- Repeat step above for other items that need to be imported.
- Click the Save or Save and Close button shown below the grid.
To apply a global change to selected items or to delete:
- Select one or more items by using the checkbox shown on the left.
- Click Global Changes. This will open a popup form.
- Select one of the following options:
- Tax Code
- Current Work (See Invoice Amount Notes below.)
- Current Stored (See Invoice Amount Notes below.)
- % Complete (See Invoice Amount Notes below.)
- Delete
- Click the Save button shown within the form.
Invoice Amount Notes:
- Current Work and Stored values DO NOT include previous amounts and are the net values just for the current billing period.
- % Complete is an overall percentage and DOES include prior billing periods.
For information on editing retainage, see Billed retainage on prime contracts