Equipment timecard log reports now include the cost rate

The cost rate has been added to the following single and multi-project equipment timecard log reports:

  • Eqp Timecards with Billable Info Grouped by Prime Contract and CO

  • Eqp Timecards with Billable Info Grouped by Prime Contract and Cost Code

  • Eqp Timecards with Billable Info Grouped by Prime Contract and Division

  • Eqp Timecards with Billable Info Grouped by Prime Contract and Owner Code

  • Eqp Timecards with Billable Info Grouped by Prime Contract and Type

  • Eqp Timecards with Billable Info Grouped by Prime Contract and Work Order

  • Cross Project - Eqp Timecards with Billable Info Grouped by Eqp Item and Project

  • Cross Project - Eqp Timecards with Billable Info Grouped by Eqp Type, Item and Project

  • Cross Project - Eqp Timecards with Billable Info Summed by Eqp Item and Project

  • Cross Project - Eqp Timecards with Billable Info Summed by Eqp Item Project Prime and JCC

  • Cross Project - Eqp Timecards with Billable Info Summed by Project and Eqp Item

  • Cross Project - Eqp Timecards with Billable Info Summed by Project Eqp Item Prime and JCC

How it works

  1. Go to Reports.

  2. Select Project Specific Reports in the Report Category dropdown and Equipment Timecards in the Report Sub-Category dropdown.

  3. Select Single Project Reports or Multi-Project Reports as needed and select the appropriate projects.

  4. In the Standard Reports tab, select one of the applicable reports.

    The Rate column includes the equipment item's hourly cost rate.